Motorists are advised of changed traffic conditions on Henry Parkes Way (Parkes to Orange Road) at the intersection with Bocobra Road for drainage work.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Cabonne Shire Council is carrying out the drainage work, including resurfacing sections of surrounding road, on behalf of Roads and Maritime Services.
Work is being carried out on weekdays from 7am to 6pm and on Saturday from 8am to 1pm and is expected to be completed by the end of May, weather permitting.
One lane will be closed and traffic controllers will be in place to direct traffic. The speed limit will be reduced to 40 km/h through the worksite during working hours.
Signs will be in place to guide motorists.
Motorists are advised to allow extra travel time and follow all signs.